Industry Solution

Cooling Water Treatment

Industrial Cooling Tower & Heat Exchanger Chemical Dosing

Application Overview

Industrial cooling water systems — including open recirculating cooling towers, closed loop systems, and once-through cooling — require continuous chemical treatment to prevent scale, corrosion, and biological fouling. Precise dosing of scale inhibitors, corrosion inhibitors, and biocides, combined with continuous monitoring of conductivity, pH, and ORP, is essential for maintaining heat transfer efficiency and system longevity.

Key Challenges

  • Precise dosing of scale inhibitors, corrosion inhibitors, and biocides at variable makeup water flow rates
  • Conductivity-based blowdown control to maintain cycles of concentration
  • pH and ORP monitoring for biocide efficacy and corrosion control
  • Legionella risk management through continuous biocide residual monitoring
  • Makeup water and blowdown flow measurement for water balance calculations
  • Chemical compatibility with treatment chemicals including oxidizing biocides

Key Monitoring Parameters

  • Conductivity / TDS
  • pH / ORP
  • Free Chlorine / Biocide Residual
  • Makeup Water Flow Rate
  • Blowdown Flow Rate
  • Cycles of Concentration

Need a Custom Solution?

Our engineers can design a complete instrumentation package for your specific process requirements.

Contact Engineering Team

Process & Instrumentation Overview

1
Makeup Water Metering

Electromagnetic flowmeter measures makeup water flow rate to trigger proportional chemical dosing.

2
Scale & Corrosion Inhibitor Dosing

Metering pumps inject scale inhibitors and corrosion inhibitors proportional to makeup water flow.

3
Biocide Dosing

Timed or ORP-controlled biocide dosing to maintain microbiological control and Legionella prevention.

4
Conductivity Monitoring & Blowdown Control

Conductivity sensor triggers automatic blowdown valve to maintain target cycles of concentration.

5
pH & ORP Monitoring

Continuous pH and ORP measurement verifies chemical treatment efficacy and corrosion protection.

Chemical Dosing Points

Dosing LocationChemicalRecommended EquipmentPurpose
Cooling Tower BasinScale & Corrosion InhibitorSolenoid Diaphragm Metering Pump (H+ Series)Continuous dosing proportional to make-up water flow
Cooling Tower BasinBiocide (Oxidizing / Non-oxidizing)Solenoid Diaphragm Metering Pump (H Series)Intermittent biocide dosing on timer or ORP control
Make-up Water LineAntiscalantMechanical Diaphragm Metering Pump (HJ-L Series)Prevent scale formation in heat exchangers
Blowdown LineNoneElectromagnetic FlowmeterMonitor blowdown rate for concentration ratio control

Water Quality Monitoring Points

Make-up Water Inlet
ConductivityFlow Rate

Conductivity Sensor + Electromagnetic Flowmeter

Cooling Tower Basin
pHORPConductivityTemperature

pH/ORP Sensor + Conductivity Sensor

Blowdown Line
ConductivityFlow Rate

Conductivity Sensor + Flowmeter

Heat Exchanger Outlet
TemperatureFlow Rate

Temperature Sensor + Flowmeter

Typical System Configuration

#011× Scale & Corrosion Inhibitor Dosing System (proportional to make-up flow)
#021× Biocide Dosing System (timer + ORP feedback control)
#032× Conductivity Sensors (make-up + basin) for concentration ratio monitoring
#041× pH/ORP Sensor in cooling tower basin
#051× Electromagnetic Flowmeter on make-up water line
#061× Automatic Blowdown Valve with conductivity controller
#071× Cooling Water Chemical Dosing Skid (all-in-one package option)

Information Required for Solution Design

To provide an accurate system recommendation, please prepare the following information before contacting our engineers:

1Cooling water circulation flow rate (m³/h)
2Make-up water quality: hardness, alkalinity, conductivity, pH
3Target concentration ratio (typically 3–6×)
4Heat exchanger material (carbon steel, stainless, copper alloy)
5Operating temperature range (°C)
6Biocide preference: oxidizing (NaOCl, ClO₂) or non-oxidizing
7Chemical storage volume and dosing frequency requirements

Ready to discuss your project?

Send us your parameters and receive a tailored solution design within 24 hours.

Request Solution Design

Frequently Asked Questions

Ready to Specify Instrumentation for Your Cooling Water Treatment Project?

Share your process parameters and our engineering team will recommend the most suitable products, provide datasheets, and prepare a quotation.